• 0

Project Consultancy, Reports & Profiles

 

Why should Start a Business in Zambia?

Here are some of them Zambia has one of the fastest growing economies in Africa and has enjoyed high rates of economic growth for over ten years. According to UNDP’s Human Development Report, Zambia’s gross national income per capita increased from $39 (PPP) in 1980 to $700 (PPP) in making it one of Sub-Saharan Africa’s most rapidly developing countries.

The country is rich in Natural Resources including copper, cobalt, uranium and other precious metals. There are more than 2 million scale businesses in Zambia. Businesses play a vital role providing goods and services. These factors make Zambia an ideal place to start a business. The World Bank classifies a country as being upper middle income when it’s GNI per capita reaches US$1,045.

 

What are the Natural Resources in Zambia?

Mining accounts for 12.5% of GDP and copper is a major export. Other Natural Resources include coal, cobalt, iron ore, bauxite and tantalum. Agriculture is an important part of Zambia's economy. Major agricultural exports include maize and tobacco but other commodities such as sugar, sesame seeds and sunflower seeds are also produced to meet local consumption demand. Food imports amounted to 1.3% of total.

 

What are the Manufacturing Business Opportunities in Zambia?

There are various starting sectors which an individual can venture into upon moving in Zambia. These are: agriculture and forestry, mining and quarrying industry, manufacturing industry, water supply and sanitation, construction (which includes energy), transportation & storage industry and financial services.

Some of these industries have a number of industrial sub-sectors where you can find suitable manufacture businesses. Agriculture is Husbandry, Crop Production and Fisheries while Forestry is divided into Timber Production, Logging and Plywood.

Mining & Quarrying has four sub-sectors namely Copper Mining, Gold Mining, Iron Ore Mining and Limestone Quarrying. Manufacturing sector consists of seven sub-sectors namely Food Processing, Beverages, Textiles and Apparel, Wood Products, Paper Products and Printing.

The Water Supply & Sanitation sector has five sub-sectors namely Sewerage Services, Water Supply Services including Operation and Maintenance Services for Water Treatment Plants. Construction Industry is also made up of several sub-sectors such as Building Construction, Civil Engineering Construction and Infrastructure Construction.

Transportation & Storage Sector covers Air Transport Services, Rail Transport Services, Road Transport Services and Sea Transport Service. Financial services consist of Banking Sector, Insurance Sector and Securities Exchange Market.

 

What Businesses are Successful in Zambia?

There are some industries that struggle in many developing markets because of political or economic instability. The following is a list of successful businesses that are currently being run successfully in Zambia * Retail * Automotive * Agriculture * Mining * Forestry (timber). These industries were have been successful in Zambia.

 

Is Zambia good for business?

Start a business in Africa, there’s no better place than Zambia. The country is growing at an impressive rate—more than 5% per year—and its economy is relatively stable. Yet despite all of these positives, many investors are interested in Zambia.  Market that has tremendous potential for growth and development. According to projections from the World Bank, Zambia will have one of the highest growth rates in sub-Saharan Africa over the years.

 

Business-Friendly Policies and Government Initiatives of Zambia:

The Government of Zambia has adopted several policies and initiated numerous initiatives to encourage a conducive environment for conducting businesses. These include: trade liberalization reforms; a reduction in red tape; an increase of electricity generation capacity and distribution; privatization of state-owned enterprises; tax breaks for investors. There is no doubt that these developments have played a big role towards improving investor confidence.

President Edgar Lung continued policies such as creation of special economic zones (SEZs) and encouraging private sector participation in infrastructure development. It initiated major economic reforms to encourage private sector development, diversify economic activity and attract investment into strategic sectors such as mining, construction and manufacturing.

The country also lowered trade barriers to expand markets. These initiatives have helped attract large-scale investments into several industries like cement production, agricultural processing.

 

Zambia Industrial Infrastructure:

Industrial infrastructure of Zambia is developed and there are large-scale industries of mining (copper, coal and emeralds) and light manufacturing. The service sector comprises 50% of GDP but most employment is concentrated in subsistence agriculture. The country has a wide range of mineral resources including copper, cobalt, uranium and emeralds. There is hydropower development and tourism.

Agriculture accounts for about 30% of GDP. It is also main source of investor earnings through cotton, cashew nuts, sugarcane and tobacco. Rice production accounts for 12% of agricultural .Livestock production accounts for 10%. Exports were US$1 billion while imports were US$1.7 billion with trade deficit at US$0.7 billion.

Imports include machinery, petroleum products, chemicals and transport equipment. Export commodities include gold, timber, coffee and fish. International reserves stood at US$2 billion. The currency is Kwacha which was introduced in 2006 replacing Zambian kwacha (ZMK). Inflation rate stood at 6%.

Bank loans to private sector grew by 23% while annual growth rate of money supply was 9%.  The fiscal policy was expansionary. Government expenditure increased by 19% while tax revenue increased by 15%. Current account balance recorded a surplus of 2%.  Investment was $US 500 million.

 

What are the steps for Starting a Business in  Zambia?

Starting a Business in Zambia steps are mention below:

Check the company name for uniqueness.

The declaration of compliance (Companies Form 11) must be signed by a Commissioner of Oaths.

Obtain a tax ID number.

Register for Social Security.

Register for VAT.

Get an investment registration certificate

Open a bank account.

And get permit license for business.

 

Market size of Zambia:

Zambia is a politically stable, multi-party democracy, rich in Natural Resources. Estimated population of 17.2 million – 42 percent urban population. Positive economic growth for 14 years. Estimates indicate the economy grew by 4.1 percent in 2017, compared to 3.8 percent in 2016.  Among the key sectors, agriculture, tourism, manufacturing, mining, and electricity generation improved from a 2015-2016 slump. In the monetary sector, the Bank of Zambia (BOZ) continued its monetary easing resulting in more commercial bank liquidity. 

Inflation remained within the BOZ’s medium target range of 6-8. The economy enjoys liberalized prices on most items, a stable foreign exchange rate, and no currency controls. In 2017, Zambia’s main export partners was Switzerland which accounted for 44.2 percent of total exports (due more to the location of commodity traders, rather than actual exportation).  Others include: China (14 percent), Singapore, South Africa, and the Democratic Republic of Congo (DRC).  During the same period, Zambia’s main import partner was South Africa followed by DRC, China, Mauritius, and Kenya.

Zambia’s total imports from the United States were $83.9 million.  These consisted primarily of machinery, rubber, and vehicles. $66.1 million in Zambian exports went to the United States.  These consisted almost entirely of copper, cobalt, precious stones (primarily emeralds), and cotton. Zambia is a member of the Southern Africa Development Community (SADC) and the Common Market for Eastern and Southern Africa (COMESA).

 

Industrial Growth of Zambia:

Industrial output in Zambia is dominated by the food, beverages and tobacco sectors. These contributed 67.6 % of manufacturing GDP. The remaining sectors contributed less than 35 % of GDP. Mining, Copper mining and processing contribute over 85% to the country's exports, Agriculture.

Agriculture plays a vital role in the Zambian economy than the mining sector. Tourism is one of the primary and growing sectors in Zambia and Energy. Five factors that spurred industrial growth in the late 1800's are Abundant Natural Resources (coal, iron, oil); Abundant labor supply; Railroads; Labor saving technological advances (new patents) Business government policies.

 

 


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)
How to Set Up an Oxygen and Nitrogen Gas Plant (Medical and Industrial Grade)

 

Limelight used oxygen extracted from the barium oxide Brin process, for example. This method in... Read More

Capacity :
3200 cumtrs/Day
Plant and Machinery cost:
183.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
675.00Lakhs
Add To Inquiry Basket
Set Up a Lithium Ion (Lifepo4) Cell Manufacturing Plant
Set Up a Lithium Ion (Lifepo4) Cell Manufacturing Plant

Introduction

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing of Ply Board from Poplar & Eucalyptus Wooden Logs
Manufacturing of Ply Board from Poplar & Eucalyptus Wooden Logs

 

Ply Board is a typ... Read More

Capacity :
Poplar Ply Board Size: 8' x 4' Thickness: 18mm:250.0 Nos. Per Day Eucalyptus Ply Board Size: 8' x 4'
Plant and Machinery cost:
260.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
536.00Lakhs
Add To Inquiry Basket
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19
Business of Industrial Gases, Start Manufacturing of Oxygen and Nitrogen Gas Plant Increasing Demand of Industrial Gases Due to Covid-19

 

Introducti... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Solar Panel
Manufacturing Business of Solar Panel

 

A photovoltaic mo... Read More

Capacity :
33 KW per day
Plant and Machinery cost:
181.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
668.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)
Active Pharma Ingredients (API) (Cephalexin, Ampicillin Trihydrate, Ibuprofen and Paracetamol)

 

The Active Pharmaceutical Ingredient (API) is the part of any drug that produce... Read More

Capacity :
Paracetamol: 500 Kgs / day Cephalexin : 500 Kgs / day Ampicillin Trihydrate: 500 Kgs / day Ibuprofen
Plant and Machinery cost:
347.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
1656.00Lakhs
Add To Inquiry Basket
Activated Bamboo Charcoal Manufacturing Business
Activated Bamboo Charcoal Manufacturing Business

 

Activated charcoal may be a non-graphite variety of charcoal and is micro crystalline in nature. It&rsquo... Read More

Capacity :
Activated Charcoal Powder: 4 MT / Day
Plant and Machinery cost:
197.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
535.00Lakhs
Add To Inquiry Basket
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol
Active Pharma Ingredients (API) Amoxicillin Trihydrate, Azithromycin & Paracetamol

 

Active pharmaceutical ingredients are the active substances that are used in th... Read More

Capacity :
Paracetamol : 1,000.0 Kgs / day Azithromycin: 500.0 Kgs / day Amoxicillin Trihydrate: 500.0 Kg
Plant and Machinery cost:
175.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1322.00Lakhs
Add To Inquiry Basket
Iron Powder from Mill Scale Scrap
Iron Powder from Mill Scale Scrap

Iron powder is an important raw material for industries engaged in the manufacture of powder metallurgy components and... Read More

Capacity :
25 MT/Day
Plant and Machinery cost:
527.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
1077.00Lakhs
Add To Inquiry Basket
Silico Manganese Production
Silico Manganese Production

Silico Manganese Production. Ferroalloys Industry

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

Solar panel refers either to a photovoltaic module, a solar thermal energy panel, or to a set of solar photovoltaic (PV) modules electrically conne... Read More

Capacity :
Solar Panel :83.3 KW / day
Plant and Machinery cost:
162.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Methanol from Coal
Methanol from Coal

Methanol is a liquid chemical with the formula CH3OH (often abbreviated MeOH). It is colorless, volatile, flammable, and poisonous. Meth... Read More

Capacity :
Methanol from Coal : 100.0MT / day
Plant and Machinery cost:
28500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
9.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
32526.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery
Lithium Ion Battery

Lithium-ion batteries are all about the movement of lithium ions: the ions move one way when the battery charges (when... Read More

Capacity :
90 Volt, 180 AH Lithium Ion Battery Pack:100,000 Nos per Annum
Plant and Machinery cost:
1017.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
34.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
4978.00Lakhs
Add To Inquiry Basket
Hybrid Electric Scooter Assembling
Hybrid Electric Scooter Assembling

Plug-in hybrids (PHEVs) use an electric motor and battery that can be plugged into the power grid to charge the batter... Read More

Capacity :
15,000 Nos per Annum
Plant and Machinery cost:
95.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
33.00%
Break Even Point (BEP):
73.00 %
TCI :
0.00 Lakhs
Cost of Project :
279.00Lakhs
Add To Inquiry Basket
Activated Charcoal from Bamboo
Activated Charcoal from Bamboo

Activated charcoal is a non graphite form of charcoal and is micro crystalline in nature. It is extensively used in va... Read More

Capacity :
1 MT/Day
Plant and Machinery cost:
186.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
446.00Lakhs
Add To Inquiry Basket
Ductile Iron Pipe Fittings Production for Water & Sewage
Ductile Iron Pipe Fittings Production for Water & Sewage

Ductile Iron Pipe Fittings Production for Water & Sewage. DI Pipes Fittings Manuf... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bioplastic Film
Bioplastic Film

Biodegradable plastics are the type of plastics that undergo decomposition over a period of time under composting condition... Read More

Capacity :
Bioplastic Film 25 Micron : 5000Kgs/Day
Plant and Machinery cost:
184.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
616.00Lakhs
Add To Inquiry Basket
Bicycle Tyre & Tubes Production from Natural Rubber
Bicycle Tyre & Tubes Production from Natural Rubber

Bicycle Tyre & Tubes Production from Natural Rubber. How to Start a Tire and Tubes Manufacturing Business Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Matchbox Manufacturing Business
Matchbox Manufacturing Business

Matchbox Manufacturing Business. Start a Match Box, Matchstick Factory. Safety Matche... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

Ferro Manganse in different gradesa is used in manufacturing of Welding Electrodes & also special types of stick e... Read More

Capacity :
50 MT/Day
Plant and Machinery cost:
904.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
3615.00Lakhs
Add To Inquiry Basket
Bioplastic Carry Bags and Garbage Bags
Bioplastic Carry Bags and Garbage Bags

BioPlastic shopping bags, carrier bags, or plastic grocery bags are a type of bioplastic bag used as shopping bags and... Read More

Capacity :
Bioplastic Carry Bags (8"x16") Size: 3,500 Kgs per day Bioplastic Garbage Bags (950x810 mm) Size
Plant and Machinery cost:
62.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
396.00Lakhs
Add To Inquiry Basket
Production of Bioplastic Film using Biodegradable Resin
Production of Bioplastic Film using Biodegradable Resin

Production of Bioplastic Film using Biodegradable Resin, PLA (Polylactic Acid). Biode... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese Production
Low Carbon Ferromanganese Production

Low Carbon Ferromanganese Production. Manufacturing Project of Low Carbon Ferromangan... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
E-Rickshaw Assembling
E-Rickshaw Assembling

E-Rickshaws are three wheel battery operated vehicles, which are considered as an upgrade to c... Read More

Capacity :
4 Nos./Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Solar panel refers either to a photovoltaic module, a solar thermal ener... Read More

Capacity :
25 MW
Plant and Machinery cost:
161.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
54.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
804.00Lakhs
Add To Inquiry Basket
Coal Washery Unit
Coal Washery Unit

Coal Washing Unit is one of the most important units for up-gradation of Coal in sense of fed value by reducing ... Read More

Capacity :
3000 MT/Day
Plant and Machinery cost:
668.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
1735.00Lakhs
Add To Inquiry Basket
Wooden Furniture Manufacturing Industry
Wooden Furniture Manufacturing Industry

Wooden Furniture Manufacturing Industry. Furniture Production Factory. Most Profitable Wood Furniture Manufacturing Busine... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Piston Rings for IC Engines (Cast Iron)
Piston Rings for IC Engines (Cast Iron)

A piston ring is an expandable split ring used to provide a seal between the piston an the cylinder wall. Piston rings are commonly made from cast ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Bicycle and Cycle Rickshaw Manufacturing
Bicycle and Cycle Rickshaw Manufacturing

A Bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the ot... Read More

Capacity :
Bicycles (Different Sizes) : 1000 Nos. /Day Cycle Rickshaw : 1000 Nos. Day
Plant and Machinery cost:
336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
1525.00Lakhs
Add To Inquiry Basket
Medical Disposables (Gowns,Drapes)
Medical Disposables (Gowns,Drapes)

Medical Disposables (Gowns/Drapes)

Surgical gowns are worn by doctors and nurses ... Read More

Capacity :
Surgeon Gowns : 250 Pcs./Day Pateint Gowns : 250 Pcs./Day Bed Sheets : 300 Pcs./Day Pillow Co
Plant and Machinery cost:
204.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
492.00Lakhs
Add To Inquiry Basket
E-Waste Recycling Plant
E-Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
Monitors : 5 Kgs /Day Plastic Granules : 2333.33 Kgs /Day Copper Wire Scraps : 13.33 Kgs /Day Gl
Plant and Machinery cost:
100.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
18.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
325.00Lakhs
Add To Inquiry Basket
Micronutrients Fertilizer
Micronutrients Fertilizer

Micronutrients are elements which are essential for plant growth, but are required in much smaller amounts than those of th... Read More

Capacity :
Micronutrient Fertilizer for Fruits : 187,500 Kgs/annum Micronutrient Fertilizer for Vegetabl
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
76.00 %
TCI :
0.00 Lakhs
Cost of Project :
114.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese
Low Carbon Ferromanganese

High Carbon Ferro- manganese containing about 7% carbon is not suitable for the production of steels or other alloys containing manganese in which ... Read More

Capacity :
Low Carbon Ferromanganes : 15,000 MT/Annum
Plant and Machinery cost:
371.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
61.00 %
TCI :
2804.00 Lakhs
Cost of Project :
2804.00Lakhs
Add To Inquiry Basket
Wooden Pencils
Wooden Pencils

A pencil is lead material enclosed in wood or put in metal holder used for drawing or writing. Pencil is a valuable item used by all levels of scho... Read More

Capacity :
Wooden Pencils 200 Gross/Day
Plant and Machinery cost:
31.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.60%
Break Even Point (BEP):
71.87 %
TCI :
55.00 Lakhs
Cost of Project :
55.00Lakhs
Add To Inquiry Basket
Iron oxide
Iron oxide

Iron oxide and oxide-hydroxide are widespread in nature, play an important role in many geological and biologi... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
1.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Ductile Iron Pipe Fittings for Water & Sewage with Lost Foam Casting Process
Ductile Iron Pipe Fittings for Water & Sewage with Lost Foam Casting Process

Casting other than a pipe, which allows pipeline deviation, change of direction or bore. In addition flanged-sockets, flanged-spigots and collars a... Read More

Capacity :
Pipe Adopter:2 MT/Day •Pipe Elbow :2 MT/Day •Pipe Flange :2 MT/Day •Pipe Union : 2 MT/Day •Pipe Redu
Plant and Machinery cost:
254.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.67%
Break Even Point (BEP):
60.85 %
TCI :
946.00 Lakhs
Cost of Project :
946.00Lakhs
Add To Inquiry Basket
Hematite from Iron Ore, Lumps
Hematite from Iron Ore, Lumps

Hematite is one of the most abundant minerals on Earth's surface and in the shallow crust. It is an iron oxide with a chemical composition of Fe2O3... Read More

Capacity :
Hematite:120 MT/Day
Plant and Machinery cost:
416.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.11%
Break Even Point (BEP):
51.00 %
TCI :
1081.00 Lakhs
Cost of Project :
1081.00Lakhs
Add To Inquiry Basket
Bicycle Manufacturing
Bicycle Manufacturing

A bicycle, is a human-powered, pedal-driven, single-track vehicle, having two wheels attached to a frame, one behind the other. A bicycle rider is ... Read More

Capacity :
Bicycles (Different Sizes):2000 Nos./Day
Plant and Machinery cost:
270.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.39%
Break Even Point (BEP):
31.24 %
TCI :
3972.00 Lakhs
Cost of Project :
3972.00Lakhs
Add To Inquiry Basket
Solar Panel
Solar Panel

A solar panel is a collection of solar cells. Lots of small solar cells spread over a large area can work together to provide enough power to be us... Read More

Capacity :
Solar Panel 5MW/Annum
Plant and Machinery cost:
109.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
62.00 %
TCI :
450.00 Lakhs
Cost of Project :
450.00Lakhs
Add To Inquiry Basket
E–Waste Recycling Plant
E–Waste Recycling Plant

Electronic wastes, "e-waste", "e-scrap", or "Waste Electrical and Electronic Equipment" ("WEEE") is a description of surplus, obsolete, broken or d... Read More

Capacity :
2164500 Kgs /Annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
526.00 Lakhs
Cost of Project :
526.00Lakhs
Add To Inquiry Basket
Low Carbon Ferromanganese and Ferrochrome (Through Alumina Thermic Process)
Low Carbon Ferromanganese and Ferrochrome (Through Alumina Thermic Process)

Manganese is used in metallurgical industries in the form of ferro manganese. Ferro manganese contains about 80% Mn and 20% Fe. Generally ferro man... Read More

Capacity :
24 MT/Day
Plant and Machinery cost:
803.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
56.00%
Break Even Point (BEP):
52.00 %
TCI :
2695.00 Lakhs
Cost of Project :
2695.00Lakhs
Add To Inquiry Basket
E–WASTE RECYCLING PLANT
E–WASTE RECYCLING PLANT

E-waste is a popular, informal name for electronic products nearing the end of their useful life. Computers, televisions, VCRs, stereos, copiers,... Read More

Capacity :
2164500 kgs. /annum
Plant and Machinery cost:
233.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
22.00%
Break Even Point (BEP):
49.00 %
TCI :
500.00 Lakhs
Cost of Project :
500.00Lakhs
Add To Inquiry Basket
Disposable Plastic Cups, Plates & Glasses
Disposable Plastic Cups, Plates & Glasses

The plastic industry in India plays a very important and key role in Industrializations. A wide spectrum of plastics and articles manufactured by t... Read More

Capacity :
1354 Lakh Pcs./annum
Plant and Machinery cost:
51.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.87%
Break Even Point (BEP):
45.83 %
TCI :
216.00 Lakhs
Cost of Project :
216.00Lakhs
Add To Inquiry Basket
Oxygen and Nitrogen Gas Plant
Oxygen and Nitrogen Gas Plant

Liquid oxygen must be handled with all the precaution required for safety with any cryogenic fluid. Gaseous Oxygen is authorized for shipment in cy... Read More

Capacity :
4152 cum/Day
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
23.00%
Break Even Point (BEP):
58.00 %
TCI :
286.00 Lakhs
Cost of Project :
286.00Lakhs
Add To Inquiry Basket
IRON ORE MINING
IRON ORE MINING

An ‘Ore’ may be defined as the aggregate of minerals from which a desired constituent mineral can be extracte... Read More

Capacity :
140 MT/Day
Plant and Machinery cost:
358.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.18%
Break Even Point (BEP):
57.96 %
TCI :
635.00 Lakhs
Cost of Project :
635.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER WITH PET BOTTLES
PACKAGED DRINKING WATER WITH PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
60000000 Nos. Bottles/Annum
Plant and Machinery cost:
217.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
45.00%
Break Even Point (BEP):
60.00 %
TCI :
456.00 Lakhs
Cost of Project :
456.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
Drinking Water – 17280000 Nos. Bottles (1 Ltr.)/Annum,Soda Water – 1008000 Nos. Bottles (600 Ml)
Plant and Machinery cost:
403.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
60.00 %
TCI :
695.00 Lakhs
Cost of Project :
695.00Lakhs
Add To Inquiry Basket
Coal Tar Pitch Distillation
Coal Tar Pitch Distillation

Coal tar is a brown or black liquid of high viscosity, which smells of naphthalene and aromatic hydro carbons. Coal tar is among the byproducts whe... Read More

Capacity :
0
Plant and Machinery cost:
1531.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
38.00 %
TCI :
3068.00 Lakhs
Cost of Project :
3068.00Lakhs
Add To Inquiry Basket
SILICOMANGANESE
SILICOMANGANESE

Manganese and silicon are crucial constituents in steelmaking, as deoxidants, desulphurizers and alloying elements. Silicon is the primary deoxidiz... Read More

Capacity :
14400 MT/Annum
Plant and Machinery cost:
897.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
40.00%
Break Even Point (BEP):
70.00 %
TCI :
1861.00 Lakhs
Cost of Project :
1861.00Lakhs
Add To Inquiry Basket
Iron ore Pelletization
Iron ore Pelletization

Iron ore pellets are spheres of typically 8-18mm (0.31-0.71 inch) to be used as raw material for blast furnace. They typically contain 67-72% Fe an... Read More

Capacity :
1200000 MT/Annum
Plant and Machinery cost:
3801.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
45.00 %
TCI :
6183.00 Lakhs
Cost of Project :
6183.00Lakhs
Add To Inquiry Basket
STEEL PROJECT (IRON, SPONGE IRON TO BILLET TO RODS)
STEEL PROJECT (IRON, SPONGE IRON TO BILLET TO RODS)

Steel is the most widely used material in a large variety of applications both simple and sophisticated. Steel is produced through two process rout... Read More

Capacity :
1020000 MT/Annum Steel Round Section
Plant and Machinery cost:
98700.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
54.00 %
TCI :
117500.00 Lakhs
Cost of Project :
117500.00Lakhs
Add To Inquiry Basket
WOODEN LABORATORY FURNITURE
WOODEN LABORATORY FURNITURE

The most common, versatile and oldest material that is used for making furniture is wood. Almost all varieties of furniture can be made of wood. Wo... Read More

Capacity :
48000 Pcs./Annum (Wooden Laboratory Furniture), Cabinet, Racks & Benches 20 Pc Per Day., Tables 60 P
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
46.00%
Break Even Point (BEP):
41.00 %
TCI :
288.00 Lakhs
Cost of Project :
288.00Lakhs
Add To Inquiry Basket
BICYCLE TUBES AND MOTORCYCLE TUBES
BICYCLE TUBES AND MOTORCYCLE TUBES

Bicycle and motorcycle tubes are the backbone of the bicycle and motorcycle industries. Few numbers of companies in the organized sectors are engag... Read More

Capacity :
300000 Nos. Bicycle Tubes, 300000 Nos. Motorcycle Tubes
Plant and Machinery cost:
105.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
50.00 %
TCI :
240.00 Lakhs
Cost of Project :
240.00Lakhs
Add To Inquiry Basket
Detergent cake, Powder and Dish washing Detergent cake and Powder
Detergent cake, Powder and Dish washing Detergent cake and Powder

Soaps are the earliest form of detergents. Though at present the term detergent is used for synthetic detergent derived from petroleum products. Th... Read More

Capacity :
Detergent Cake, Powder, Dish washing Cake & Powder Each 1 MT/Day = 4 MT/Day
Plant and Machinery cost:
28.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
47.00%
Break Even Point (BEP):
37.00 %
TCI :
239.00 Lakhs
Cost of Project :
239.00Lakhs
Add To Inquiry Basket
COAL TAR PITCH
COAL TAR PITCH

Coal tar pitch is the residue from the processing of coal tar. Since pitch constituents over 50% of crude tar, its utilization has a major effect o... Read More

Capacity :
7500 MT/Annum
Plant and Machinery cost:
143.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
43.00%
Break Even Point (BEP):
56.00 %
TCI :
340.00 Lakhs
Cost of Project :
340.00Lakhs
Add To Inquiry Basket
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES
PACKAGED DRINKING WATER, SODA WATER AND PET BOTTLES

Bottled water industry, colloquially called, the mineral water industry, is a symbol of new life style emerging in India. While a large segment of... Read More

Capacity :
0
Plant and Machinery cost:
403.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
44.00%
Break Even Point (BEP):
60.00 %
TCI :
695.00 Lakhs
Cost of Project :
695.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)
Packaged Drinking Water with Pet Glasses (250 ml) (Automatic Plant)

Almost a decade ago, the introduction of bottled water or packaged water has changed the traditional of serving and consuming drinking water. Accor... Read More

Capacity :
128000 Packs/Day
Plant and Machinery cost:
219.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
20.00%
Break Even Point (BEP):
59.00 %
TCI :
323.00 Lakhs
Cost of Project :
323.00Lakhs
Add To Inquiry Basket
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)
Packaged Drinking Water with Pet Bottles (1 ltr) (Automatic Plant)

Bottled Water means water intended for human consumption and which is sealed in bottles and other containers with no added ingredients except that ... Read More

Capacity :
32,000 Ltrs/Day
Plant and Machinery cost:
221.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
19.00%
Break Even Point (BEP):
60.00 %
TCI :
327.00 Lakhs
Cost of Project :
327.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Investing into Business o... 12 MT per Day 33.83 1135.00
Emerging Business of Duct... 0 0.00 0.00
Ferrochrome Manufacturing... Ferrochrome 135 MT Per Day 10.00 40400.00
Start a Business Of LPG C... LPG Cylinders (14.20 Kgs Size) 3,334.0 Nos. per day LPG Cylinders (19 Kgs Size) 3,334.0 Nos. per day 32.00 3475.00
Start Banana Wine Product... Banana Wine (750 ml size Bollte) 2,960 Bottles per day 25.00 1189.00
Activated Carbon From Ric... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Activated Carbon F... Activated Carbon 2,000 Kg Per Day 25.00 606.00
Set Up Business of Flat G... 0 0.00 0.00
Set Up Business of Double... 0 0.00 0.00
A Business Plan for Bio-D... 10,000 MT Per Annum 28.00 8100.00
Sulphur Powder Manufactur... 20,000 MT Per Annum 24.00 4318.00
Manufacturing Business Gi... 60,000 Kg. Per Annum , 1,44,000 Kg. Per Annum 28.00 528.00
Start a Business of Manuf... 1,500 Dz. Per Annum 35.00 34.00
Start Activated Carbon fr... 0 0.00 0.00
Most Demandable Business ... 0 0.00 0.00
Cumin, Turmeric, Chilly &... 0 0.00 0.00
Start Production Of Wire ... Wire Nails: 48,000 MT Per Annum, Wire Scraps: 4,500 MT Per Annum 30.00 1736.00
Auto Brake Pad and Auto... Auto Brake Pads 3,600,000 Nos. Per Annum Auto Brake Shoes 720,000 Nos. Per Annum 27.00 1422.00
Business Plan for Product... Double Wall Vacuum Steel Bottles 600,000 Bottles Per Annum Single Wall Vacuum Steel Bottles 600,0 28.00 1619.00
A Business Plan for Ferri... Ferric Pyrophosphate 600 MT Per Annum 31.00 133.00
How to Start A Business o... 0 0.00 0.00
A Business Plan for Seawo... Standard Seaworthy Container Size: 20Ft 2,400 Nos. Per Annum 28.00 2040.00
Setup Extraction of Salt ... Iodized Salt: 30,000 MT per annum, Industrial Salt: 30,000 MT per annum 29.00 2776.00
A business Plan For Surgi... Surgical Sutures: 450,000 Boxes per annum 27.00 877.00
Starting up production of... Glycerol Monostearate: 900 MT Per Annum 29.00 320.00
Startup A Business of Dou... 0 0.00 0.00
Now Is The Time To Take C... 0 0.00 0.00
Start Production of Potat... Potato Chips: 150,000 Kgs Per Annum Kurkure Type Snacks: 150,000 Kgs Per Annum 30.00 121.00
Setup Cashew Nut Processi... Cashew Nut Processing: 4,794 Kgs Per Day 23.00 1100.00
Start a Business of Parti... Particle Board (Size 4ftx8ftx16 inch.): 150,000 Nos. Per Annum 30.00 1100.00
12345678910...

Showing 541 - 600 of 693 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR